We are specialists in professional diving related to energy, dams and power plants of any kind. Hydroelectric, combined cycle, nuclear power plants … we know them and we know what are the repair elements, necessary maintenance services, etc.
Projects carried out by Demoliciones Submarinas:
WORK |
LOCATION |
DATE |
Repair and assembly of intake and drainage tower – Aguas de Torrelavega |
Corrales, Cantabria | 2019 |
Installation of floating intake pumps, Alsa reservoir SIECSA – CHN |
Alsa, Cantabria | 2018 |
Assembly of filtering tower in pump well – Asturiana de Zinc |
Cantabria | 2015 |
Trashracks Substitution Arbon P.P. – ASTURBALFER |
Navia, Asturias | 2012 |
Equipment UW Installation – Cuadernas y Arcos | Cantabria | 2011 |
Piles Cutting Ebro Reservoir – Marco Civil Engineers |
Reinosa, Cantabria | 2010 – 2011 |
Trashracks Cleaning Doiras P.P. – VIESGO GENERATION | Doiras, Asturias | 2009 |
Trashracks Substitution Arbon Power Plant – MONRASA | Navia, Asturias | 2004 – 2005 |
Gates Installation Seros Channel – HIDROMONT |
Seros, Lérida | 2004 |
Gate Lifting Porma Power Plant – HIDROMONT IDAE |
Porma, León | 2004 |
Shields Installation Arbon Power Plant | Navia, Asturias | 2004 |
Arbon Dam Dredging – VIESGO GENERATION | Navia, Asturias | 2003 |
Reel Guides Cleaning Encinarejo Power Plant – HIDROMONT |
Andújar, Jaén | 2003 |
Sealants Measurement Silvon P.P. – VIESGO GENERATION | Doiras, Asturias | 2003 |
Bulkhead Gates Installation Aguayo P.P – VIESGO GENERATION | S. Miguel de Aguayo, Cantabria | 2003 |
Shields Installation Porma P.P – HIDROMONT | Porma, León | 2001 |
Gate Guides Substitution Liguerzana Power Plant – VIESGO GENERATION |
Ag. de Campoo, Palencia | 2001 |
Bulkhead Gates Extraction Arbon Power Plant – VIESGO GENERATION |
Navia, Asturias | 2000 |