Engineering projects that require technical knowledge, precision and, above all, reliability for the correct development of the whole. Our experience in maritime and submarine work, and our technical training, offers a differentiation to the engineering with which we collaborate.

ACTIVITIES:

  • Video And Cctv Surveillance
  • Measuring Procedures
  • NDT Trials (Non Destructive)
  • Topography
    – Bathymetries (Echosounder)
    – Sonar Side Sweep

Projects carried out by Demoliciones Submarinas:

WORK

LOCATION

DATE

Deba Bridge – FHECOR Deba 2018 – 2019
Villarente Bridge – AUDECA León 2018
Ribeira Outfall – SAITEC Ribeira 2015 – In progress
Lagares Outfall – Fulcrum Lagares, Vigo 2014 – In progress
Berria Outfall – TRAGSA Santoña, Cantabria 2013 – 2014
Bembibre Water Intake – ACUANORTE Ponferrada – León 2011 – 2012
Plentzia Outfall – FULCRUM Plentzia – Vizcaya 2010 – 2011
Bens Outfall – FULCRUM Bens – A Coruña 2007 – 2011
Argoños River Outfall – SAITEC Argoños, Galicia 2007
Berria Outfall – PAYMA – COTAS Santoña, Cantabria 2004
Raos Dock#8 – EUROCONSULT Santander, Cantabria 2001 – 2002
Chiqui Outfall Santander Water Board Santander, Cantabria 2001
Santander General Outfall APIA XXI Santander, Cantabria 1999 – 2001